Continued growth has led to the expansion of MiTek’s St. Charles, Missouri industrial facility.
– 52,000 sq ft expansion to MiTek’s existing
manufacturing facility
– Tilt-up concrete construction
– Two 20 ton Bridge Cranes
– Four 10 ton Bridge Cranes
– 80′ wide structural column spacing
– 30′ minimum clear height
– Two semi-trailer truck drive thru lanes inside the expansion